Close Menu
Bharat Speaks
  • Trending
  • Motivation
  • Health
  • Education
  • Development
  • About Us
What's Hot

How One Student’s Innovation Is Helping Cities Save Millions of Litres of Water

February 27, 2026

Gurgaon Steps Up Cleanliness Efforts with New Machinery Hiring Plan

February 27, 2026

Green Boost for Aravallis: Massive Native Tree Plantation Begins Along KMP Expressway

February 27, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Bharat Speaks
Subscribe
  • Trending
  • Motivation
  • Health
  • Education
  • Development
  • About Us
Bharat Speaks
Home»Development»Pothole-Ridden Pushta Road Gets Major Overhaul to Ease Peak-Hour Chaos
Development

Pothole-Ridden Pushta Road Gets Major Overhaul to Ease Peak-Hour Chaos

Sharad NataniBy Sharad NataniFebruary 27, 2026No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

In a major step toward tackling chronic traffic congestion on the Noida Expressway, the Noida Authority has announced a Rs 30-crore revamp of the Yamuna Pushta Road — a crucial alternative route connecting Kalindi Kunj to Sector 135. The long-neglected 11.5-km stretch, currently riddled with potholes and uneven surfaces, is set to be resurfaced in the coming weeks.

Key Backup Route to Get Major Upgrade
Running parallel to the expressway along the Yamuna embankment, the four-lane Pushta Road serves as a vital backup corridor, especially during peak office hours when the main expressway witnesses heavy congestion. Officials said improving this route will significantly ease pressure on the arterial link between Delhi and Greater Noida.
Approvals from the irrigation department — which oversees the embankment — have already been secured, clearing the way for repair work to begin soon.

Benefits for Local and Intra-City Traffic
Authorities believe the upgraded road will particularly benefit residents of adjoining sectors who currently rely on the expressway even for short trips due to the poor condition of alternative routes.
In addition to resurfacing, plans are underway to fix missing links on 45-metre-wide sector roads running alongside the expressway. Plugging these gaps will allow smoother movement across sectors and reduce unnecessary entry onto the already crowded main corridor.

Larger Connectivity Plans Still Stalled
The Pushta Road was once envisioned as part of a larger riverside expressway project linking Kalindi Kunj to the Yamuna Expressway at Pari Chowk. However, concerns about the structural safety of the embankment stalled the ambitious plan.
A proposal for an elevated corridor also received preliminary approval but remains stuck due to pending regulatory clearances.

Immediate Focus on Practical Solutions
Until large-scale projects materialise, officials are prioritising practical measures such as repairing existing infrastructure and improving sector road connectivity. Approximately 2.5 acres of land will be required to complete missing stretches between several sectors, which will help create a continuous diversion route during peak traffic, emergencies, or maintenance work.

A Much-Needed Lifeline
For thousands of daily commuters navigating one of NCR’s busiest corridors, the Pushta Road upgrade promises smoother travel, shorter commute times, and a reliable alternative to the often gridlocked Noida Expressway.
If implemented efficiently, the project could transform a neglected riverside road into a critical urban lifeline for the rapidly growing city.

📲 Join Our WhatsApp Channel
Algoritha Registration
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Previous ArticleChoking Horror: 18-Month-Old Critical After Peanut Blocks Airway, Dramatic Rescue in Noida
Next Article Noida Set to Become Med-Tech Hub as ASCA-Certified Labs Planned at Device Park
Sharad Natani

Related Posts

How One Student’s Innovation Is Helping Cities Save Millions of Litres of Water

February 27, 2026

Gurgaon Steps Up Cleanliness Efforts with New Machinery Hiring Plan

February 27, 2026

Green Boost for Aravallis: Massive Native Tree Plantation Begins Along KMP Expressway

February 27, 2026
Add A Comment
Leave A Reply Cancel Reply

Top Posts

Subscribe to Updates

Get the latest sports news from SportsSite about soccer, football and tennis.

Welcome to BharatSpeaks.com, where our mission is to keep you informed about the stories that matter the most. At the heart of our platform is a commitment to delivering verified, unbiased news from across India and beyond.

We're social. Connect with us:

Facebook X (Twitter) Instagram YouTube
Top Insights
Get Informed

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© 2026 Bharat Speaks.
  • Trending
  • Motivation
  • Health
  • Education
  • Development
  • About Us

Type above and press Enter to search. Press Esc to cancel.